The case is relevant if more than one scheduling point has been assigned in the group.


The system allows to set employee scheduling over several points. 

When optimising the work schedule, an employee will be assigned over possible points as needed (the employee will not be scheduled to his unwanted points).


Steps to be taken to schedule employees over several points:


1. Click employee name and surname in the schedule (to open employee card) 

2. Click the option - 100% at K880 PC Akropolis KLP in the example


3. Mark If necessary, can work in another point in the new window 

4. Main point indicates the main scheduled workplace of the employee. Indicating the minimum percentage of working hours to be scheduled in the main point (percentage is to be indicated in the sliding scale below)

5. Click Save


If no unwanted points have been specified, the system will decide on another (other than the main scheduling ) point for scheduling the employee according to his calculated workload and the number of assigned employees.


Related articles:

How do I set unwanted scheduling points of employees?